|
1.0 |
OBJECTIVE
: |
||||||||
|
|
To provide a
Procedure For Entry And Exit from Quality Control department. |
||||||||
|
2.0 |
SCOPE
: |
||||||||
|
|
This procedure is
applicable for entry and exit to Quality Control department at XYZ |
||||||||
|
3.0 |
RESPONSIBILITY
: |
||||||||
|
|
All Employee of the Department |
||||||||
|
4.0 |
ACCOUNTABILITY: |
||||||||
|
|
Quality Control Head |
||||||||
|
5.0 |
PROCEDURE
: |
||||||||
|
|
5.1 |
ENTRY IN
QUALITY CONTROL DEPARTMENT |
|||||||
|
|
|
5.1.1 |
Collect
the set of uniform from linen counter. |
||||||
|
|
|
5.1.2 |
Enter
in the respective change room (Gents
will enter through gents change |
||||||
|
|
|
|
room and
Ladies will enter through ladies change room). |
||||||
|
|
|
5.1.3 |
Follow the
gowning procedure. |
||||||
|
|
|
5.1.4 |
Staff will
wear white apron, while workers will
follow dress code of secondary packing
worker. |
||||||
|
|
|
5.1.5 |
Remove the street footwear, keep in the rack
provided and wear the laboratory Footwear. |
||||||
|
|
|
5.1.6 |
Enter to wide corridor leading to main QC door. |
||||||
|
|
|
5.1.7 |
Enter at the main QC door and proceed to
respective rooms / section. |
||||||
|
|
|
|
|
||||||
|
|
5.2 |
EXIT FROM
QUALITY CONTROL DEPARTMENT |
|||||||
|
|
|
5.2.1 |
Exit the
respective rooms / sections and come to
the wide QC corridor. |
||||||
|
|
|
5.2.2 |
Enter in to the wide corridor. |
||||||
|
|
|
5.2.3 |
Enter in respective change room (Gents will enter
to gents change room and |
||||||
|
|
|
|
Ladies will enter to ladies
change room). |
||||||
|
|
|
5.2.4 |
Remove the laboratory footwear
in the rack provided. |
||||||
|
|
|
5.2.5 |
Exit from the respective change
room by following the procedure for degowning. |
||||||
|
|
|
5.2.6 |
Keep the set of factory uniforms in the
individual lockers or put in the container for Washing purpose.
|
||||||
|
|
|
|
|
||||||
|
6.0 |
ABBREVIATIONS: |
||||||||
|
|
|
||||||||
|
7.0 |
ANNEXURES: NIL |
||||||||
|
|
|
||||||||
|
8.0 |
SOP REFERENCES: |
||||||||
|
|
GLP Guidelines |
||||||||
|
9.0 |
SOP REVISION HISTORY RECORD: |
||||||||
|
|
|
||||||||
|
|
END OF THE SOP |
||||||||
Showing posts with label SOP for Entry And Exit from Quality Control department. (Standard Operating Procedure). Show all posts
Showing posts with label SOP for Entry And Exit from Quality Control department. (Standard Operating Procedure). Show all posts
Saturday, 23 October 2021
SOP for Entry And Exit from Quality Control department. (Standard Operating Procedure)
Posted by mypharmasolution.blogspot.com on October 23, 2021