Showing posts with label OPENING AND CLOSING OF THE DEPARTMENT. Show all posts
Showing posts with label OPENING AND CLOSING OF THE DEPARTMENT. Show all posts

Saturday, 23 October 2021

OPENING AND CLOSING OF THE DEPARTMENT

 

1.0

OBJECTIVE :

 

 

To describe a procedure for Opening and Closing of the Quality Control Department.

 

2.0

SCOPE :

 

 

This procedure is applicable to Quality Control department at XYZ Company

 

3.0

RESPONSIBILITY :

 

 

Quality Control Chemist and above

 

4.0

ACCOUNTABILITY:

 

 

Quality Control Head

 

5.0

PROCEDURE :

 

 

Follow the following procedure for Opening and Closing of each department,

 

 

5.1

OPENING OF  THE DEPARTMENT:

 

 

 

5.1.1

Get issued the keys of Quality Control department from security department,

 

 

 

 

make signature in the register, put date and time. Only departmental official person is authorized to collect the key and open the department.   

 

 

 

5.1.2

Follow SOP on Entry and Exit procedure (SOP No.: ----)

 

 

 

5.1.3

Ensure that door lock of the department is ok.

 

 

 

5.1.4

Unlock the door lock and open the department. 

 

 

 

5.1.5

Switch on the lights in respective areas as per need.

 

 

 

5.1.6

Check entire department for any abnormality / discrepancy (If found, inform

 

 

 

 

to senior / Head of the department).

 

 

 

5.1.7

Switch on the A/C in respective are as per need.

 

 

 

5.1.8

Ensure proper cleaning by the sweepers in the department.

 

 

 

5.1.9

After checking the things are satisfactory, start the work.

 

 

 

5.1.10

Report abnormal observations if any, to Chemist/Officer or Executives.

 

 

 

 

 

 

5.2

CLOSING OF THE DEPARTMENT:

 

 

 

5.2.1

Ensure that all the workers and staff members leave the respective sections.

 

 

 

5.2.2

Switch off the A/C of the respective area.

 

 

 

5.2.3

Ensure switch off all the lights of the respective sections of department.

 

 

 

5.2.4

Ensure that all the mains of the instruments except stability chambers and incubators are switch OFF.

 

 

 

5.2.5

Ensure regulator of the LPG (Liquefied Petroleum Gas)is at close position.

 

 

 

5.2.6

Ensure the control sample room is locked and key is deposited to department head.

 

 

 

5.2.7

Verify the water supply of stability chamber is properly regulated.

 

 

 

5.2.8

Check all water taps are closed, except stability chambers.

 

 

 

5.2.9

Lock the respective section.

 

 

 

5.2.10

Deposit the keys to security department make signature in the register and put date and time.

 

 

 

 

    

 

6.0

 ABBREVIATIONS:

 

 

 

 

 

 

Abbreviation

Expanded form

SOP

Standard Operating Procedure

A/C

Air Conditioner

 

7.0

ANNEXURES:

NIL

 

 

 

 

8.0

SOP REFERENCES:

 

 

 GMP guideline

 

 

 Safety guideline

 

 

9.0

SOP REVISION HISTORY RECORD:

 

 

 

 

 

 

Revision

Details for change

Effective date

01

 

 

 

END OF THE SOP