|
1.0 |
OBJECTIVE : |
||||||||
|
|
To describe a procedure for Opening and Closing of the Quality Control
Department. |
||||||||
|
2.0 |
SCOPE : |
||||||||
|
|
This procedure is applicable to Quality Control department at XYZ
Company |
||||||||
|
3.0 |
RESPONSIBILITY : |
||||||||
|
|
Quality Control Chemist and above |
||||||||
|
4.0 |
ACCOUNTABILITY: |
||||||||
|
|
Quality Control Head |
||||||||
|
5.0 |
PROCEDURE : |
||||||||
|
|
Follow the following procedure for Opening and Closing of
each department, |
||||||||
|
|
5.1 |
OPENING OF THE DEPARTMENT: |
|||||||
|
|
|
5.1.1 |
Get issued the keys of Quality Control department from
security department, |
||||||
|
|
|
|
make signature in the register, put date and time. Only
departmental official person is authorized to collect the key and open the
department. |
||||||
|
|
|
5.1.2 |
Follow SOP on Entry and Exit procedure (SOP No.: ----) |
||||||
|
|
|
5.1.3 |
Ensure that door lock of the department is ok. |
||||||
|
|
|
5.1.4 |
Unlock the door lock and open the department. |
||||||
|
|
|
5.1.5 |
Switch on the lights in respective areas as per need. |
||||||
|
|
|
5.1.6 |
Check entire department for any abnormality / discrepancy (If
found, inform |
||||||
|
|
|
|
to senior / Head of the department). |
||||||
|
|
|
5.1.7 |
Switch on the A/C in respective are as per need. |
||||||
|
|
|
5.1.8 |
Ensure proper cleaning by the sweepers in the department. |
||||||
|
|
|
5.1.9 |
After checking the things are satisfactory, start the
work. |
||||||
|
|
|
5.1.10 |
Report
abnormal observations if any, to Chemist/Officer or Executives. |
||||||
|
|
|
|
|||||||
|
|
5.2 |
CLOSING OF THE DEPARTMENT: |
|||||||
|
|
|
5.2.1 |
Ensure that all the workers and staff
members leave the respective sections. |
||||||
|
|
|
5.2.2 |
Switch off the A/C of the respective area. |
||||||
|
|
|
5.2.3 |
Ensure switch off all the lights of the
respective sections of department. |
||||||
|
|
|
5.2.4 |
Ensure that all the mains of the instruments
except stability chambers and incubators are switch OFF. |
||||||
|
|
|
5.2.5 |
Ensure regulator of the LPG (Liquefied
Petroleum Gas)is at close position. |
||||||
|
|
|
5.2.6 |
Ensure the control sample room is locked and
key is deposited to department head. |
||||||
|
|
|
5.2.7 |
Verify the water supply of stability chamber
is properly regulated. |
||||||
|
|
|
5.2.8 |
Check all water taps are closed, except
stability chambers. |
||||||
|
|
|
5.2.9 |
Lock the respective section. |
||||||
|
|
|
5.2.10 |
Deposit the keys to security department make signature in the register and put date and time. |
||||||
|
|
|
|
|
||||||
|
6.0 |
ABBREVIATIONS: |
||||||||
|
|
|
||||||||
|
7.0 |
ANNEXURES: NIL |
||||||||
|
|
|
||||||||
|
8.0 |
SOP REFERENCES: |
||||||||
|
|
GMP guideline |
||||||||
|
|
Safety guideline |
||||||||
|
9.0 |
SOP REVISION
HISTORY RECORD: |
||||||||
|
|
END OF THE SOP |
Showing posts with label OPENING AND CLOSING OF THE DEPARTMENT. Show all posts
Showing posts with label OPENING AND CLOSING OF THE DEPARTMENT. Show all posts
Saturday, 23 October 2021
OPENING AND CLOSING OF THE DEPARTMENT
Posted by mypharmasolution.blogspot.com on October 23, 2021
Posted in OPENING AND CLOSING OF THE DEPARTMENT