Saturday 23 October 2021

SOP for Entry And Exit from Quality Control department. (Standard Operating Procedure)

1.0

OBJECTIVE :

 

To provide a Procedure For Entry And Exit from Quality Control department.

2.0

SCOPE :

 

This procedure is applicable for entry and exit to Quality Control department at XYZ

3.0

RESPONSIBILITY :

 

All  Employee of the Department

4.0

ACCOUNTABILITY:

 

Quality Control Head

5.0

PROCEDURE :

 

5.1

ENTRY IN QUALITY CONTROL DEPARTMENT

 

 

5.1.1

 Collect the set of uniform from linen counter.

 

 

5.1.2

 Enter in  the respective change room (Gents will enter through gents change

 

 

 

 room and Ladies will enter through ladies change room).

 

 

5.1.3

 Follow the gowning procedure.

 

 

5.1.4

 Staff will wear white apron, while  workers will follow dress code of secondary 

 packing worker.

 

 

5.1.5

Remove the street footwear, keep in the rack provided and wear the laboratory   Footwear.  

 

 

5.1.6

Enter to wide corridor leading to main QC door.

 

 

5.1.7

Enter at the main QC door and proceed to respective rooms / section.

 

 

 

 

 

5.2

EXIT FROM QUALITY CONTROL DEPARTMENT

 

 

5.2.1

  Exit the respective rooms / sections and come to  the wide QC corridor.

 

 

5.2.2

Enter in to the wide corridor.

 

 

5.2.3

Enter in respective change room (Gents will enter to gents change room and

 

 

 

  Ladies will enter to ladies change room).

 

 

5.2.4

  Remove the laboratory footwear in the rack provided.

 

 

5.2.5

  Exit from the respective change room by following the procedure for degowning.

 

 

5.2.6

Keep the set of factory uniforms in the individual lockers or put in the container for Washing purpose.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        

 

 

 

 

6.0

ABBREVIATIONS:

 

 

Abbreviation

Expanded form

QC

Quality  Control

7.0

ANNEXURES: NIL

 

 

8.0

SOP REFERENCES:

 

 

 GLP Guidelines

9.0

SOP REVISION HISTORY RECORD:

 

Revision

Details for change

Effective date

01

 

 

 

END OF THE SOP